Projects completed
Salerno – Reggio Calabria A3 Highway – Casalbuono Tunnel
Salerno, SA, Italia
Go to Google Maps
Products involved
MAPEPLAN TU
Rome Metro- Lot C-Cento Celle Station and Alessandrino Station
Rome, Italy
Go to Google Maps
Products involved
MAPEPLAN TU
Feuerfelsen/Rennberg Tunnels
Coburg, Deutschland
Go to Google Maps
Contractor
ARGE Marti Coburg Ost
Owner
DB ProjektBau GMBH Regionalbereich Sudost
Description
Drill and blast excavation method with shotcrete application of 5.8 km long rail section consisting of the Feuerfelsen tunnel (1043 m) and 1032 m of the Rennberg tunnel.
Products involved
MAPEQUICK 043 FFG
Nazzano Highway Tunnel in Rome
Rome, Italy
Go to Google Maps
Contractor
Cossi S.p.A
Description
The enlargement of the Nazzaro highway tunnel cover 185 m2 of excavation section with 19.2 m diameter and 337*2 m. The pre-casted concrete of the final lining of the tunnel have been make with Dynamon SG 40.
Dannemora Mine - Sverige
Österbybruk, Uppsala County, Sverige
Go to Google Maps
Contractor
Bergteamet AB
Owner
Dannemora Mineral AB
Products involved
MAPEQUICK AF 2000
Kankberg Mine
Boliden, Sverige
Go to Google Maps
Contractor
Strabag AB
Owner
Boliden AB
Products involved
MAPEQUICK AF 2000
Zinkgruva Mine
Askersund, Örebro County, Sverige
Go to Google Maps
Contractor
KGS/LKAB Berg & Betong
Owner
Zinkgruva mining AB
Products involved
MAPEQUICK AF 2000, MAPEQUICK AF 118, MAPEQUICK AF 1000
Kiruna Mine
Kiruna, Sverige
Go to Google Maps
Contractor
Bergteamet AB
Owner
LKAB
Products involved
MAPEQUICK AF 1000
Catania Metro- Papa Giovanni XXII Station
Catania, CT, Italia
Go to Google Maps
Salerno – Reggio Calabria A3 Highway – Km 126 Cut and Cover Tunnel
Salerno, SA, Italia
Go to Google Maps
Salerno – Reggio Calabria A3 Highway – Macrolotto 3
Lauria, PZ, Italia
Go to Google Maps
Salerno – Reggio Calabria A3 Highway- Morano Calabro
Morano Calabro, CS, Italia
Go to Google Maps
S.S. 77 Valdichienti – Foligno (PG)
Foligno, PG, Italia
Go to Google Maps
Products involved
MAPEPLAN TU
Mont Blanc Tunnel
Mont Blanc, Chamonix, France
2000 - 2002
Go to Google Maps
Description
Tunnel Rehabillitation. UTT Mapei used: Mapegrout BM, Mapegrout T 60, Idrostop Mastic, Mapesil BM, Rescon T, Ignisilex Malta 4, Eporip.
Products involved
MAPEGROUT BM, IDROSTOP MASTIC, EPORIP, MAPEGROUT T60
LTA Circle Line Stage 2- Contract 822
Singapore
2003 - 2005
Go to Google Maps
Contractor
Econ Pte Ltd & NCC (Sweden)
Owner
Land Transport Authority
Description
The mechanized excavation of twin tunnels of 2.1 km in length was possible with two Mitsubishi EPB-TBM Type.
Products involved
MAPECOAT W, POLYFOAMER FP, POLYFOAMER FP, STABILFOAM 300, STABILFOAM 300
Deep Tunnel Sewerage System (DTSS T-06)
Singapore
2003 - 2004
Go to Google Maps
Contractor
Zublin
Description
An EPB TBM Herrenchnekt type of 4 m diameter.
Products involved
MAPEQUICK AF400, MAPEGROUT TISSOTROPICO, MAPEGROUT RAPIDO, DYNAMON SP1
LTA Circle Line Stage 4- Contract 852
Singapore
2004 - 2006
Go to Google Maps
Contractor
Who Hup, Shannai Tunnel and Alpine Mayreder
Owner
Land Transport Authority
Description
The drives were driven using two Herrecnknecht EPBM's of 2*1.650 m in lenght and were lined with concrete sgements of 5.8 m of internal diameter.
Products involved
MAPECOAT W, POLYFOAMER FP, POLYFOAMER FP, STABILFOAM 300, STABILFOAM 300, MAPEDRILL F1, MAPEDRILL F1
LTA Circle Line Stage 1- Contract 825
Singapore
2004 - 2005
Go to Google Maps
Contractor
Who Hup, Shannai Tunnel and NCC (Sweden)
Owner
Land Transport Authority
Description
The excavation of the 1.6 km twin tunnel were driven with two Herrenknecht EPB-TBM type.
Products involved
MAPECOAT W, POLYFOAMER FP, POLYFOAMER FP, STABILFOAM 300, STABILFOAM 300, MAPEGROUT GUNITE, MAPEGROUT TISSOTROPICO
Cable Tunnel C-302
Singapore
2004 - 2008
Go to Google Maps
Contractor
Downer Engineering
Description
The Tunnel of 2.65 km long was excavated with a TBM, manufactured by LOVAT, of a 6.15 m diameter.
The entire tunnel alignment was constructed beneath the ground water table.The alignment from northwest to southeast supported a maximum ground water pressure above invert up to 3.7 bar.
Products involved
POLYFOAMER FP, POLYFOAMER FP, STABILFOAM 300, STABILFOAM 300
LTA Circle Line Stage II-Contract 853
Singapore
2005 - 2007
Go to Google Maps
Contractor
Taisei Corporation
Description
The excavation of twin tunnel of 3 km long was made by a Herrenknecht EPB TBM type.
Products involved
POLYFOAMER FP, POLYFOAMER FP, MAPECOAT W
Eiksund Undersea Tunnel
Norway
2005 - 2009
Go to Google Maps
Contractor
Mesta AS
Owner
SVV Møre og Romsdal
Description
The Eiksund Tunnel is part of the Eiksundsambandet project, a fixed link between the Norwegian mainland and Hareidlandet Island, off the More og Romsdal county coast. The 7,765m long Eiksund road tunnel is, to date, the world’s deepest undersea tunnel, reaching a depth of 287m below mean sea level at its deepest point. The tunnel profile varying between T8.5 and T11.5.
Salerno – Reggio Calabria A3 Highway – Pertusata Tunnel
Lagonegro, PZ, Italia
2005 - 2006
Go to Google Maps
Budapest Metro Line 4
Budapest, Hungary
2006 - 2010
Go to Google Maps
Contractor
BAMCO (VINCI and STRABAG)
Description
Two Herrenknecht EPB machines excavated the Metro Line that connects southwest Budapest (Buda) to northeastern Budapest (Pest).
Products involved
POLYFOAMER FP, POLYFOAMER FP, MAPEPLAST N10, MAPEQUICK CBS SYSTEM 1
LTA Line Circle Stage I Contract 828 Singapore
Singapore
2006 - 2008
Go to Google Maps
Contractor
Nishimatzu Constructions & Lum Change JV
Owner
Land Transport Authority
Description
The construction of the mass Rapid Transit rail system of the Singapore island have been excavated by two Herrenknecht EPBM's, that went through soft marine clays, fluvial sands, as well as strong to very strong rocks. 1200 m length twin bore and 6.61 m diameter cut.
Products involved
STABILFOAM 300, STABILFOAM 300, MAPEBLOX T, MAPEOIL HFR 46
Catania Metro-Nesima Station
Catania, CT, Italia
2006 - 2008
Go to Google Maps
Products involved
MAPEPLAN TU
Catania Metro-Ognina Station
Catania, CT, Italia
2006 - 2008
Go to Google Maps
LTA Circle Line Stage 2 - Contract 823
Singapore
2006 - 2007
Go to Google Maps
Contractor
Nishimatsu Construction & Lum Chang JV
Owner
Land Transport Authority
Description
The EPB-TBM Hitachi type excavated on soft ground in the two tunnel drives.
Products involved
MAPEBLOX T, MAPECOAT W, STABILFOAM 300, STABILFOAM 300
Downtown MRT Project Line- Contract PIBE 4 at Singapore
Singapore
2006 - 2012
Go to Google Maps
Contractor
Penta Ocean
Owner
Land Transport Authority (LTA)
Description
The Downtown Line (DTL) will be the fifth Mass Rapid Transit line in Singapore. The line will be about 42 km long with 34 stations and serve about half a million commuters daily.
Products involved
MAPEBLOX PKG
Atlanterhavstunnelen ”Atlantic Ocean Tunnel”
Norway
2007 - 2010
Go to Google Maps
Contractor
Mesta AS
Owner
SVV Møre og Romsdal
Description
The length of the Atlantic Ocean Tunnel is 5 730 m and the tunnel profile is T 11.5 and T 8.5. The subsea road tunnel runs beneath the Bremsnesfjorden between Øksenvågen in Averøy and Hagelin in Kristiansund, reaching a depth of 250 metres, making it one of the deepest subsea road tunnels in the world.
Products involved
MAPETARD SD2000, MAPETARD SD2000, MAPEQUICK AF 2000
Jablunkov Tunnels Reconstruction
Mosty u Jablunkova, Česká republika
2007 - 2011
Go to Google Maps
Description
As part of the project of the Third Railway Corridor Modernisation in the border section of the route between Slovakia and the Czech Republic it was planned the reconstruction of the two old parallel single-rail tunnels, eliminating the single old single one tunnel.
Products involved
MAPEQUICK 101 FFG, DYNAMON NRG 1014, MAPEQUICK AFK 889, DYNAMON SX 14, MAPESTART 1
Jurong Island Rock Carven
Singapore
2008 - 2009
Go to Google Maps
Contractor
Sato Kogyo Pte LTD
Owner
JTC Corporation
Description
Sprayed concrete application on two shafts of 132 m depth and 18.5 m diameter at the bottom level to 23 m diameter at surface.
Products involved
MAPEQUICK AFK 888, STABILCEM T, STABILCEM T, STABILCEM T
Metro Line C-Rome
Roma, RM, Italia
2008 - 2010
Go to Google Maps
Contractor
Metro C S.c.p.A. Astaldi, Vianini Lavori, CCC, Ansaldo STS, CMB
Description
The Metro Line C in Rome was excavated with 4 EPB shields manufactered by Herrenchnecht. The TBM drilled in a very urbanized area with the presence of several buildings:therefore the control of superficial settlements was of a paramount importance.
Products involved
MAPEQUICK CBS SYSTEM 1, MAPEQUICK CBS SYSTEM, POLYFOAMER FP, POLYFOAMER FP, MAPEDRILL M1, MAPEDRILL M1, MAPEDRILL M1, MAPEBLOX T
Power Grid in Singapore
Singapore
2008 - 2010
Go to Google Maps
Contractor
McConnell Dowell
Owner
Singapore Power
Description
Three tunnels of 16, 12 and 2 km respectively excavated with Robbins EPB-TBM, with the aim to drive power at around 50 m depth to connect power stations west of the island to consumers in the eastern part of the island.
Products involved
STABILFOAM 300, STABILFOAM 300
Brightwater Tunnel in Seattle
Seattle, USA
2008 - 2010
Go to Google Maps
Contractor
MWH Jacobs Associate a joint Venture (Vinci-Parsons)
Owner
King County, Wastewater Treatment Division
Description
The wastewater treatment tunnel indlude 9.7 km bored with a EPB- TBM from LOVAT with 5.3 external diameter. The tunnel drives are part of the 13 mille Brightwater conveyance system to carry treated wastewater from the treatment plant to a new outfall in Puget Sound.
Products involved
MAPEBLOX PKG
Highway S.S 125 Sardegna
Sardegna, Italia
2008 - 2012
Go to Google Maps
Contractor
Todini Costruzioni Generali S.p.A
Owner
ANAS S.p.A
Description
The Highway S.S 125 constituites the new highway that connects North and South Sardegna, Italy. Three tunnel of around 9 km (64 km totl of Highway) have been excavated by Drill and Blast method.
Products involved
MAPEQUICK AF800, PLANITOP 400, MAPEFIBRE CN54, MAPEPLAN TU
Boaventura Express tunnels
Madeira, Portugal
2009 - 2010
Go to Google Maps
Contractor
Tamega Madeira SA
Owner
Estradas de Madeira
Description
Tunnel Waterproofing with PVC membrane
Products involved
MAPEPLAN TU
Douro Litoral A41 Highway Picoto-Aguiar da Beira
Picoto, Portugal
2009 - 2011
Go to Google Maps
Contractor
DLOE (Zagope, Alves Ribeiro, Tamega, Teixeira)
Owner
Estradas de Portugal
Description
Drill and Blast tunnel excavation for the A41 Highway at Madeira, Portugal
Products involved
MAPEQUICK AF800, IDROSTOP, PLANITOP T, MAPEPLAN TU, PLANICRETE
Nova Ligacao Rodoviaria- Jardim di Serra Tunnel
Estrada do Jardim da Serra, Estreito De Câmara, Portugal
2010 - 2010
Go to Google Maps
Contractor
Tecnovia da Madeira
Owner
Estradas di Madeira
Description
Tunnel waterproffing with PVC membrane
LTA Downtown Line Stage 1- Contract 902
Singapore
2010 - 2011
Go to Google Maps
Contractor
Shanghai Tunnel Contractor Co.LTD
Owner
Land Transport Authority
Description
The 6.35 m diameter tunnel was excavated with an EPB-TBM (SHANGHAI) type.
Products involved
MAPEQUICK CBS SYSTEM 2, POLYFOAMER FP, POLYFOAMER FP, MAPEBLOX T, MAPEDRILL BIO L, MAPEDRILL BIO L
Underground Tunnel Prague
Praha, Česká republika
2010 - 2010
Go to Google Maps
Contractor
Sdruzeni Metro V.A.
Owner
Dopravni podnik hl.m.Prahy a.s
Products involved
POLYFOAMER FP, POLYFOAMER FP, MAPEQUICK CBS SYSTEM 1, MAPEQUICK CBS SYSTEM 2, FOAMJET F, DISARMANTE DMA 2000, MAPESTART 1
Salerno – Reggio Calabria A3 Highway – Lagonegro Tunnel
Lagonegro, PZ, Italia
2010 - 2010
Go to Google Maps
Contractor
SIS-TORINO
Owner
ANAS (NATIONAL MOTORWAY)
Products involved
MAPEPLAN TU S
Hydraulic tunnel “Arroyo Maldonado”
Buenos Aires, Argentina
2010 - 2012
Go to Google Maps
Contractor
Ghella
Description
Two LOVAT EPB shields excavated the "Arroyo Maldonado", the relief tunnel of the biggest river in Buenos Aires (Rio de la Plata), preventing floods of downtown areas. The TBMs drilled through very heterogeneous geological condition.
Products involved
MAPEDRILL M1, POLYFOAMER FP, MAPEDRILL M1, MAPEDRILL M1, MAPEQUICK CBS SYSTEM 1, MAPEQUICK CBS SYSTEM 3, MAPEBLOX T, POLYFOAMER FP
Sofia Metro Line 1 Bulgary
Sofia, Bulgaria
2010 - 2013
Go to Google Maps
Contractor
Taisei Corporation
Description
The execution of the underground project intersect the city of the Bulgarian capital.
Products involved
MAPEDRILL M1, MAPEDRILL M1, MAPEDRILL M1, MAPEDRILL BIO L, MAPEDRILL BIO L, MAPEBLOX T, MAPEBLOX PKG, DYNAMON NRG 1014
Rosedale Tunnel in New Zealand
New Zealand
2010 - 2012
Go to Google Maps
Contractor
McConnell Dowell
Description
The 2.8km long sewage tunnel was excavated with a LOVAT TBM-EPB.
The Polyfoamer FP has been used for the ground conditioning.
Highway A1- Bologna-Florence-South Side-Cut and Cover Tunnel
A1, Florence, FI, Italia
2010 - 2012
Go to Google Maps
Highway A1-Bologna-Florence-South Side-Drill and Blast Tunnel
A1, Florence, FI, Italia
2010 - 2011
Go to Google Maps
Description
Waterproofing
Turecky VRCH Tunnel
Bratislava, Slovenská republika
2010 - 2011
Go to Google Maps
Contractor
Consortium OHL ZS A.S-Skanska SK A.S.
Products involved
MAPEPLAN TU WL
Trento Tunnel
Trento, TN, Italia
2010 - 2010
Go to Google Maps
Description
Tunnel Rehabilitation
UTE Amorebieta Tunnel Viscaya, Spain
Amorebieta, España
2010 - 2010
Go to Google Maps
Contractor
BALZOLA-MURIAS
Description
Tunnel waterproofing with PVC membrane.
Products involved
MAPEPLAN TU
Jondal Road Tunnel
Hordaland, Norway
2010 - 2013
Go to Google Maps
Contractor
Kruse Smith AS
Owner
SVV Hordaland
Description
The Jondal road tunnel connects Kvinnherad with Jondal on the west coast of Norway. The tunnel is designed to
improve the traffic between the two largest cities in Norway, Bergen and Oslo. The tunnel is 10600 m long and the profile is T 8.5.
Kulch and Lichtenholz Tunnels
Ebensfeld, Deutschland
2010 - 2012
Go to Google Maps
Contractor
DB ProjekBau HmbH Regionalbereich Sudost
Owner
ARGE Lichtenfels (HOCHTIEF, Alpine)
Description
A double track railway tunnel (1 tube each) was excavted by traditional drill and blast method. The Kulch tunnel of 1,331 m and the Tunnel Lichtenholz with 931 m went trough clay, marl, limestone alternationa nd sandstone respectively.
Products involved
MAPEQUICK 043 FFG
Old Schluchtern Tunnel
Frankfurt, Deutschland
2011 - 2013
Go to Google Maps
Contractor
Alpine Untertagebau GmbH
Owner
Deustsche Bahn
Description
Tunnel Rehabilitation of the existing "Old Schluchtern tunnel" of about 100 years located on the Frankfurt am Main.
Products involved
MAPEQUICK 043 FFG
Pumped Storage Plant Vianden Luxemburg
Vianden, Luxembourg
2011 - 2012
Go to Google Maps
Contractor
Grand Duchy of Luxemburg RWE Power AG
Owner
ARGE PSW Vianden
Description
Shotcrete application. Extension of the Largest pumped storage plant located at Luxembourg. The power plant uses the pumped storage hydroelectric method to generate electricity and serves as a peaking power plant. A new cavern and a set of tunnels are under excavation with the aim to house the turbine-generator and penstock.
Products involved
MAPEQUICK 043 FFG
New Schluchtern Tunnel
Frankfurt, Deutschland
2011 - 2012
Go to Google Maps
Contractor
Alpine Untertagebau GmbH
Owner
Deutsche Bahn
Løren Road Tunnel
Norway
2011 - 2013
Go to Google Maps
Contractor
Veidekke AS
Owner
SVV Region Øst
Description
The length of the Løren Tunnel is 1200 m, that comprises two parallel tunnels and the emergency tunnel. The tunnel profile is T12,5. This road tunnel is a part of a major project at Ring road 3 in Oslo, Norway.
Kvivs Tunnel
Norway
2011 - 2012
Go to Google Maps
Contractor
Skanska AS
Owner
SVV Møre & Romsdal
Description
The tunnel is 6490 m long and the profile is T9.5. The project of the road tunnel has been realized between the Møre og Romsdal and Sogn og Fjordane counties in western Norway, on the E39 highway.
E10 Hamnøy Tunnel
Norway
2011 - 2013
Go to Google Maps
Contractor
LNS AS
Owner
SVV Nordland
Description
The E10 Hamnøy Tunnel in Lofoten was completed in the 2013 and is part of the avalanche protection project Solbjørneset - Hamnøy. The length of the road Tunnel is 1460 m and the tunnel profile is T8,5.
Bremanger Connection 2.
Norway
2011 - 2013
Go to Google Maps
Contractor
Mesta AS
Owner
SVV Sogn & Fjordane
Description
The Bremanger Connection 2, includes the Bortnen tunnel and Holnes tunnel, was completed in the 2013. The length of the road tunnel is 4758 m and 200 m and the tunnel profile is T8,5.
MTRC West Island Line Contract 703
Hong Kong Island, Hong Kong
2011 - 2011
Go to Google Maps
Contractor
Dragades Maeda Bachy JV
Owner
MTRC
Description
Tunnel waterproofing
Products involved
MAPEPLAN TU S, IDROSTOP
Erneuerung Alter Schlüchtener Tunnel
Germany
2011 - 2012
Go to Google Maps
Contractor
Alpine Untertagebau GmbH
Description
Tunnel rehabilitation
Products involved
MAPEQUICK 043 FFG (SBE), ADESILEX P9, PLANITOP 400
Warsaw Metro Line 2
Warszawa, Polska
2011 - 2014
Go to Google Maps
Contractor
AGP Metro (Astaldi-Gulermark-PBDIM)
Description
Four EPB-TBM by Herrenknecht have excavated the second metro line in Warsaw
Products involved
POLYFOAMER FP/CC, MAPEBLOX T, MAPEBLOX PKG, MAPEQUICK CBS SYSTEM, RESFOAM 1KM
Transcity Tunnel at Brisbane
Brisbane, Queensland, Australia
2011 - 2013
Go to Google Maps
Contractor
GHELLA S.p.A (Italy), Acciona (Spain) and BMD (Austrialian)
Description
The Legacy Way project in Brisbane has been completed and represents an innovative project in the mechanized tunnelling field. Two Hard Rock-TBMs, manufactured by Herrenknecht were used and excavated approx. 4,6 km of tunnels. This are the first two TBM all over the world that are using the two-component bakfill grouting system.
Gorleri Tunnel-Highway A10, Savona
Savona, SV, Italia
2011 - 2012
Go to Google Maps
Contractor
ABC and MGA
Description
Tunnel Rehabilitation
Perosa Tunnel- Valle di Susa Highway # 32 at Bardonecchia
Bardonecchia, TO, Italia
2011 - 2011
Go to Google Maps
Description
Tunnel Rehabilitation of the 1.010 m twin tunnel Turin A32 Highway located at Bardonecchia, Italy.
Simplonbahntunnel
Switzerland
2011 - 2012
Go to Google Maps
Contractor
SBB
Owner
Martig & Bürgi AG, Valjetting AG
Description
Mapegrout 430, Mapegrout Gunite 300 AF
DSD Lai Chi Kok Drainage Tunnel- Contract DC/2007/16
Hong Kong Island, Hong Kong
2011 - 2011
Go to Google Maps
Contractor
Leighton-Jhon Holland JV
Owner
Drainage Services department (DSD) of HKSAR Government
Description
Drainage tunnel excavation with Hydroshield for Slurry type TBM
Products involved
MAPEBENT CBS 2
DSD Tsuen Wan Drainage Tunnel Contract DC/2007/12
Hong Kong Island, Hong Kong
2011 - 2012
Go to Google Maps
Contractor
Maeda- CREC- SELI JV
Owner
Drainage Services department (DSD) of HKSAR Government
Description
Grouting works
Products involved
MAPEQUICK CBS SYSTEM 2, MAPEBENT CBS 2, MAPEDRILL F.R.A. 01
MTRC Express Line Project 822- Tse Uk Tsuen to Shek Yam Tunnels, Chueng Sha Wan
Hong Kong Island, Hong Kong
2011 - 2011
Go to Google Maps
Contractor
Leighton Contractors (Asia) Ltd
Owner
MTRC
Description
Tunnel waterproofing
Products involved
MAPEPLAN TU S
MTRC Express Rail Link Project 820
Hong Kong Island, Hong Kong
2011 - 2013
Go to Google Maps
Contractor
Dragages-Bouygues JV
Owner
MTRC
Description
Mechanized tunnel excavation with hydroshields for slurry type TBM
Products involved
MAPEBENT CBS 2
MTRC Express Rail Link Project 825
Hong Kong Island, Hong Kong
2011 - 2011
Go to Google Maps
Contractor
Penta Ocean Construction Co Ltd
Owner
MTRC
Description
Mechanized tunnel excavation with EPB machine
Products involved
POLYFOAMER FP, POLYFOAMER FP, MAPEBLOX T, MAPEBENT CBS 2, MAPEQUICK CBS SYSTEM 2
MTRC West Island Line Project 704
Hong Kong Island, Hong Kong
2011 - 2011
Go to Google Maps
Contractor
Gammon Nishimatsu JV
Owner
MTRC
Description
Tunnel waterproofing
Products involved
MAPEPLAN TU S, IDROSTOP
LTA Downtown Line Stage 2-Contract 919
Singapore
2011 - 2012
Go to Google Maps
Contractor
Sambawang
Owner
Land Transport Authority
Description
The twin tunnels of 980 m length were excavated simultaneously with 2 Herrenknecht EPB-TBM type.
Products involved
POLYFOAMER FP, POLYFOAMER FP, MAPEBENT CBS 2, MAPEQUICK CBS SYSTEM 1, MAPEQUICK CBS SYSTEM 2, MAPEBLOX T, MAPEDRILL F1, MAPEDRILL F1
LTA Downtown Line Stage 2-Contract 915
Singapore
2011 - 2013
Go to Google Maps
Contractor
SK Engineering (Sub contract to Dongha Engineering)
Owner
Land Transoort Authority
Description
3 Slurry TBM (Kawasaki) excavated mix ground within 2 km twin tunnels and 1.4 km.
Products involved
MAPEBENT CBS 2
LTA Downtown Line Stage 2- Contract 920
Singapore
2011 - 2013
Go to Google Maps
Contractor
Shanghai Tunnel Engineering
Owner
Land Transport Authority
Products involved
POLYFOAMER FP, POLYFOAMER FP, MAPEQUICK CBS SYSTEM 1, MAPEBLOX T, MAPEDRILL F1, MAPEDRILL F1, MAPECOAT W, MAPEBLOX PKG
Variante de Ferreries-Menorca, Spain
Menorca, Spain
2011 - 2011
Go to Google Maps
Contractor
Ferrovial
Description
Tunnel Waterproofing with PVC membrane
Products involved
MAPEPLAN TU WL
MTRC Express Rail Link Project 826
Hong Kong Island, Hong Kong
2012 - 2013
Go to Google Maps
Contractor
CRCC-HC-CR15G Joint Venture
Owner
MTRC
Description
Mechanized tunnel excavation with slurry TBM type
Products involved
MAPEBENT CBS 2
Borlaug Tunnel
Norway
2012 - 2013
Go to Google Maps
Contractor
Mesta AS, Implenia AS
Owner
SVV Sogn & Fjordane
Description
Borlaugs tunnel is a 4050 meter long tunnel and the profile is T 8.5. The road tunnel is part of the road project Borlaug-Smedal Osen to overcome the ascent Filefjell from the west side.
BRE.BE.MI Highway-ADDA Viaduct
Brescia, Italia
2013 - 2013
Go to Google Maps
Contractor
IAT
Owner
Brebemi SpA
Description
Viaduct waterproofing with sprayable membrane
 