| Yard | Wukesong Basketball Indoor Stadium |
|---|---|
| Location | Beijing, China |
| Subcategory | STADIUM |
| Opened in | 2008 |
| Application | Laying rubber floorings |
| Application Type | Installation of floors |
| Client | Wukesong Culture & Sports Center Co Ltd and BOCOG(Beijing Organizing Committee for the XXIX Olympic Games) |
| Contractor company | Urban Engineering Group (China) and Zhongguancun Construction Associates (China) |
| Installer companies | Beijing Institute of Architectural Design (Huyue Studio and Second Design Studio) and Burckhardt + Partner (Switzerland) |