DIBBA BULK HANDLING TERMINAL

Location icon Dibba, United Arab Emirates
Ref #: 42065
Category: INFRASTRUCTURES

Construction

Yard Access underpass
Location Dibba, United Arab Emirates
Subcategory TUNNEL
Built in 2020
Opened in 2022
Application For application on the interior of the tunnel
Start and finish date 2021/2022
Application Type Waterproofing systems
Client Port of Fujairah
Contractor company GBH international Group
Installer companies ISSAM K. KABBANI GROUP OF COMPANIES
Architects Jacobs

Product used for the project

ADESILEX PG2 TG
ADESILEX PG2 TG
Two-component thixotropic epoxy adhesive for bonding Mapeband, Mapeband TPE,…
IDROSTOP
IDROSTOP
Hydrophilic expandable rubber section for watertight construction joints.…
IDROSTOP MULTI ME
IDROSTOP MULTI ME
PVC-P re-injectable hoses for waterproofing injections. Idrostop Multi 15 ME…
IDROSTOP PVC BI BE ME
IDROSTOP PVC BI BE ME
PVC waterstop for sealing expansion and cold joints.
MAPEFLEX PU S25
MAPEFLEX PU S25
Low modulus elastic polyurethane sealant for joints. Mapeflex PU S25 has been…
MAPEPLAN INJECTION VALVE
MAPEPLAN INJECTION VALVE
Injection valve

Keep in touch

Subscribe to our newsletter to get Mapei news