Fitting out work at Venetian Cotai Macau Parcel 3 - Podium & Eiffel Tower (Restroom L6)
Hong Kong
Ref #: 852360
Category: RESIDENTIAL BUILDINGS
Construction
|
|
Yard |
Estrada da Baia de Nossa Senhora da Esperanca, Macau
|
Location |
Hong Kong
|
Subcategory |
APARTMENTS
|
Application |
Substrate preparation (levelling) for Artigo rubber tiles installation
|
Start and finish date |
2016
|
Application Type |
Installation of floors
|
Client |
Venetian Macau
|
Contractor company |
1) Casson Building Materials (HK) Co. Ltd. 2) Hsing Chong construction
|
Architects |
Aedas
|
MAPEI Distributor |
Mapei China Ltd. (Hong Kong)
|
Exception occured while executing the controller. Check error logs for details.
Keep in touch
Subscribe to our newsletter to get Mapei news