Chantier | JW Marriott Miami |
---|---|
Localisation | Miami, ÉTATS-UNIS |
Sous-catégorie | HÔTEL/AUBERGE |
Construit en | 2016 |
Ouvert en | 2017 |
Demande | JW Marriott Miami |
Date de début et de fin | 2016/2017 |
Type de demande | Finitions murales |
Titulaire | Marriott International, Inc. |
Entreprise de sous-traitance | Diversified Construction and Engineering |
Installateurs | Diversified Construction and Engineering |
Distributeur MAPEI | National Waterproofing Supply |
Crédits | Raul Ballester |
Responsable de projet | Emerson Barahona |
Coordination MAPEI | Carlos Hernandez |
Other | Concrete-restoration products and a decorative protective coating were required to give a facelift to the JW Marriott Miami hotel. The restoration of the facade included the removal and replacement of large areas of detached finish, additional crack repair to the surface and finishing of the facade with an Elastocolor® weatherproof decorative-coating system. |
Copyright © 2025 MAPEI BENELUX S.A. Tous droits réservés.
Mapei Benelux S.A. Rue de l'Avenir, 40 4460 Grâce-Hollogne - Belgique
Tel +32-04-2397070 - [email protected] - TVA BE0455 328 589