| Chantier | UG 25, Parking garage, parking spaces, concrete ceiling of the first floor |
|---|---|
| Localisation | St. Gallen, SUISSE |
| Sous-catégorie | PARKING |
| Demande |
The concrete ceiling of the first floor originally consisted of an old ribbed slab, which was structurally reinforced and refurbished.
Products from Mapei Suisse SA were used for the concrete restoration, including Mapefer 1K Zero and more than 100 tonnes of Mapegrout Easy Flow. |
| Date de début et de fin | 2024 |
| Type de demande | Restauration des betons |
| Installateurs | ARGE CeMo: Morant AG, St. Gallen | Cellere Bau AG, St. Gallen |
| Responsable de projet | Pensionskasse Stadt St.Gallen |
| Coordination MAPEI | Jan Koch |