| Chantier | 80.000 square meters floors of carpark |
|---|---|
| Localisation | Пекін, CHINE |
| Sous-catégorie | PARKING |
| Construit en | 2017 |
| Ouvert en | 2019 |
| Demande | supplying products to lay cementitious floors in the carpark of the west wing |
| Date de début et de fin | 2019 |
| Type de demande | Sols a base de ciment ou resines |
| Titulaire | Shouzhong Investment Management Co. Ltd |
| Entreprise de sous-traitance | China Construction Eighth Engineering Bureau |
| Installateurs | Henan Jian’An Waterproof and Anticorrosive Engineering Co.,Ltd |
| Responsable de projet | Joint Design Team including Zaha Hadid Architects, ADP Ingénierie (ADPI), BIAD (Beijing Institute of Architectural Design) and CACC (China Airport Construction Group Corporation), Beijing Architectural Design and Research Institute |
| Coordination MAPEI | Guo Ming, Mapei Construction Materials (Guangzhou) Co. Ltd. |
Vous pouvez télécharger ici tous les documents associés à ce projet
Copyright © 2025 MAPEI BENELUX S.A. Tous droits réservés.
Mapei Benelux S.A. Rue de l'Avenir, 40 4460 Grâce-Hollogne - Belgique
Tel +32-04-2397070 - [email protected] - TVA BE0455 328 589