MAPECOAT I 600W

Two-component transparent epoxy primer in water dispersion.
TECHNICAL DATA:
Consistency of mix: fluid.
Colour of mix: opaline.
Mixing ratio: comp. A: comp. B = 2.3 : 3.6.
Workability time: 2-3 hours.
Dust dry at +23°C and 50% R.H.: 3-4 hours (first coat); 6-8 hours (second coat).
Final hardening time: 7 days.
Application temperature range: from +8°C to +35°C.
Storage: 24 months in its original sealed packaging.
Application: roller, spray or airless spray.
Consumption: 300-500 g/m², depending on the absorbency rate of diluted product.
Packaging: 5.9 kg kits and 11.8 kg kits (A + B).

Related documentation

Technical data sheet
Download

Last Projects MAPECOAT I 600W

Category icon RESIDENTIAL

2017/2019

Jardins de la Pâla, Bulle

Bulle, Switzerland

Cemetitious and resin floor coverings

Category icon SPORT FACILITIES

2019

RIVERSIDE TENNIS AND NETBALL CENTRE RECONSTRUCTION

Ascot Vale (Melbourne), Australia

Solutions for sports flooring, Surface preparation

Category icon ART/VARIOUS

2018/2019

Jihoslovanské mauzoleum jugoslávských vojínu

Olomouc, Czech Republic

Waterproofing, Structural reinforcement, Masonry restoration, Concrete restoration, Wall coverings

Category icon RESIDENTIAL

2018

Impermeabilizzazione lastrico con Purtop 400 M

CASOLI, Italy

Waterproofing

Keep in touch

Subscribe to our newsletter to get Mapei news