MAPEWRAP 31

Two-component, medium-viscosity epoxy adhesive for impregnating MAPEWRAP using the “dry system”.
TECHNICAL DATA:
Mixing ratio: comp. A : comp. B = 4 : 1.
Workability time: 40 minutes (at +23°C).
Bond strength to concrete: > 3 N/mm² (after 7 days at +23°C - failure of substrate).
Brookfield Viscosity: 6,500 mPa·s (rotor 3 - 10 revs).
Classification: EN 1504-4.
Consumption: according to the type and width of the fabric.
Packaging:
5 kg kits:
– 4 kg drums (comp. A);
– 1 kg drums (comp. B).

Related documentation

Technical data sheet
Download

Last Projects MAPEWRAP 31

Category icon PUBLIC BUILDINGS/PLACES

2019/2020

“Vienybės” square Lithuania

Kaunas, LITHUANIA, Norway

Structural reinforcement, Roading

Category icon PUBLIC BUILDINGS/PLACES

2018/2019

Public Toy Library

Castrì di Lecce, Italy

Wall coverings, Structural reinforcement

Category icon PUBLIC BUILDINGS/PLACES

2017/2018

Fusco Theatre

Taranto, Italy

Cemetitious and resin floor coverings, Structural reinforcement

Category icon RESIDENTIAL

2018

Valva condominium

Valva, Italy

Structural reinforcement

Keep in touch

Subscribe to our newsletter to get Mapei news