TRIBLOCK P

Three-component epoxy-cementitious primer for non-absorbent waterproofing damp substrates.
TECHNICAL DATA:
Consistency: comp. A liquid; comp. B liquid; comp. C powder.
Colours: comp. A white; comp. B white; comp. C white.
Mixing ratio: comp. A : comp. B : comp. C = 12 : 38 : 50.
Workability time: 30-40 minutes.
Waiting time between first and second coat: 4-6 hours.
Waiting time before laying floors or applying smoothing compound: 18 hours.
Maximum waiting time before laying floors or applying smoothing compound: 7 days.
Storage: 24 months.
Application: brush or roller.
Consumption: 0.5 kg/m².
Packaging: 5 kg drums (A+B+C).

Related documentation

Technical data sheet
Download

Last Projects TRIBLOCK P

Category icon SPORT FACILITIES

2018

Fijlkam Olympic Centre

Ostia, Italy

Solutions for sports flooring

Category icon PUBLIC BUILDINGS/PLACES

2017/2018

Studio Legale Neri

Ostia Lido, Italy

Waterproofing

Category icon INFRASTRUCTURES

2019

Digestore anaerobico depuratore ACEA Roma Sud

Roma, Italy

Waterproofing

Category icon SPORT FACILITIES

2019

Gualdo Cattaneo multisport court

Gualdo Cattaneo, Italy

Solutions for sports flooring

Keep in touch

Subscribe to our newsletter to get Mapei news