Tuen Mun – Chek Lap Kok Link Northern Connection Sub-sea Tunnel Section

Location icon Artificial Island of Tung Chung, Hong Kong
Ref #: 852848
Category: PUBLIC BUILDINGS/PLACES

Construction

Yard Back of house of Hong Kong Boundary Crossing Facilities
Location Artificial Island of Tung Chung, Hong Kong
Subcategory HOUSE, PLANT
Application Installation of quarry tile (Area: 20000 sq.m) (300x600, 800x600 mm)
Start and finish date 2019/2020
Application Type Tile & stone installation systems
Client ASD
Contractor company Dragages-Bouygues Joint Venture
Installer companies Wai Tai Engineering (HK) Co. Ltd
MAPEI Distributor Mapei China Ltd. (Hong Kong)

Product used for the project

ADESILEX P9
ADESILEX P9
High-performance cementitious adhesive with no vertical slip and extended open…
KERACOLOR FF
KERACOLOR FF
Pre-blended, high-performance, polymer-modified cementitious mortar with…
PLANICRETE
PLANICRETE
Synthetic rubber latex for improving adhesion and mechanical strength of…

Keep in touch

Subscribe to our newsletter to get Mapei news