Yard | Epic Systems Corporate Campus |
---|---|
Location | Madis, USA |
Subcategory | SCHOOL |
Application | Epic Systems Corporate Campus |
Application Type | New building, Supplying of admixtures |
Contractor company | J.H. Findorff & Son, Inc. |
Architects | Cuningham Group & Zimmer Gunsul Frasca Architect |
Other |
Project Engineer: Magnusson Klemincic Ready Mix Supplier: Wingra Redi-Mix Project Facts: Unique award winning project located on 350 acres of rolling hills near Madison, WI. Project includes a three-story office building structured over a below grade, three-level post-tensioned underground parking ramp. Due to occupancy requirements by the owner, four office buildings and one parking ramp were constructed on a parallel schedule instead of a consecutive schedule. This fast track schedule entailed using high performance concrete to ensure the schedule was met. This project utilized 35,000 cy of poured in-place concrete. 20 different mix designs were used throughout this project. |
Unit 6, RM 901, Port Center, No.406, Yanjiangzhong Road, Yuexiu District, Guangzhou, P.R. China
Tel 020-83653489
Mapei Building Materials Technology (Zhejiang) Co., Ltd
No.1633, Shilin Road, Wuxing, Huzhou, Zhejiang, China
Tel: 0572-215 9888
E-mail: [email protected]