| Yard | safety tunnel, roadway, sidewalks |
|---|---|
| Location | Noiraigue, Switzerland |
| Subcategory | TUNNEL |
| Application |
The project first includes the construction of a safety tunnel parallel to the existing tunnel, connected by six cross-passages serving as emergency exits.
Afterwards, the tunnel will be refurbished with the complete renovation of the drainage systems, the roadway, the sidewalks, and the electromechanical equipment. |
| Start and finish date | 2024/2026 |
| Application Type | Waterproofing |
| Installer companies | Consortium CNTCL (Infra tunnel, Bieri Grisoni, Facchinetti, Bernasconi) |
| Architects | BG Ingénieurs Conseils SA, Neuchâtel | OPAN concept SA, Neuchâtel |
| Specialists involved | Canton of Neuchâtel |
| MAPEI Coordination | Alexandre Perona |
Unit 6, RM 901, Port Center, No.406, Yanjiangzhong Road, Yuexiu District, Guangzhou, P.R. China
Tel 020-83653489
Mapei Building Materials Technology (Zhejiang) Co., Ltd
No.1633, Shilin Road, Wuxing, Huzhou, Zhejiang, China
Tel: 0572-215 9888
E-mail: [email protected]