| Yard | A resilient floor installation has been completed at the new Forest of Dean Community Hospital with a sustainable Mapei system. |
|---|---|
| Location | Gloucestershire, United Kingdom |
| Subcategory | HOSPITAL |
| Application |
The installation, which featured designs from Forbo, was completed by Rotherham-based Titan Flooring for Speller Metcalfe. The Mapei specification included floor preparation products and adhesives, each featuring EMICODE: EC1 Plus formulations.
The Mapei application spanned treatment and consultant rooms, waiting areas, therapy and recovery rooms, x-ray and ultrasound departments, bedrooms, corridors and stairs, WC’s, nappy changing areas, stores, bays and utility, kitchens and server rooms. |
| Start and finish date | 2023 |
| Application Type | Installation of floors |
| Contractor company | Speller Metcalfe |
| Installer companies | Rotherham-based Titan Flooring |
Unit 6, RM 901, Port Center, No.406, Yanjiangzhong Road, Yuexiu District, Guangzhou, P.R. China
Tel 020-83653489
Mapei Building Materials Technology (Zhejiang) Co., Ltd
No.1633, Shilin Road, Wuxing, Huzhou, Zhejiang, China
Tel: 0572-215 9888
E-mail: [email protected]