Yard | double road bridge |
---|---|
Location | Bucharest, Romania |
Subcategory | BRIDGE |
Built in | 2010 |
Opened in | 2014 |
Application | application of anti-carbonation protection coat |
Start and finish date | 2014 |
Application Type | Wall coverings |
Client | BUCHAREST CITY HALL |
Contractor company | ASTALDI SPA |
Installer companies | ASTALDI SPA |
MAPEI Distributor | ASTALDI SPA |
Other | Two parallel passages for each sense, one with a length of 675.4 meters and the second with a length of 687.7 meters. The width of the two bridges is 7.8 meters. The contribution of MAPEI was to protect concrete structures against carbonation using the mos |
Unit 6, RM 901, Port Center, No.406, Yanjiangzhong Road, Yuexiu District, Guangzhou, P.R. China
Tel 020-83653489
Mapei Building Materials Technology (Zhejiang) Co., Ltd
No.1633, Shilin Road, Wuxing, Huzhou, Zhejiang, China
Tel: 0572-215 9888
E-mail: [email protected]