| Yard | Renovation and change of use of the premises of the physiotherapy practice. | 
|---|---|
| Location | Bex, Switzerland | 
| Subcategory | HOSPITAL | 
| Application | The floor subfloors had to be levelled before installation. This was achieved by means of spot filling, vapour retarders and final smoothing. In addition, 320m² of LVT flooring was laid with Ultrabond Eco 4 LVT. | 
| Start and finish date | 2022 | 
| Application Type | Installation of floors | 
| Architects | JME architecture SA | 
| Specialists involved | Start.Physio | 
| MAPEI Coordination | Marcello Maieron | 
                                
                                
                                
                                
                                
                                
                                Unit 6, RM 901, Port Center, No.406, Yanjiangzhong Road, Yuexiu District, Guangzhou, P.R. China
Tel  020-83653489
Mapei Building Materials Technology (Zhejiang) Co., Ltd
No.1633, Shilin Road, Wuxing, Huzhou, Zhejiang, China
Tel: 0572-215 9888
E-mail: [email protected]