Yard | Slabs |
---|---|
Location | Dubai, United Arab Emirates |
Subcategory | MALL |
Built in | 2021 |
Opened in | 2023 |
Application | Concrete slabs strengthening; Concrete Columns Strengthening; PT Lock Termination |
Start and finish date | 2022 |
Application Type | Structural reinforcement |
Client | Union Cooperative |
Contractor company | Ginco Cont. Sharjah (GCC) |
Installer companies | Al Haddad Concrete Repairs |
Architects | Al Hashemi |
MAPEI Coordination | Moayad |
Unit 6, RM 901, Port Center, No.406, Yanjiangzhong Road, Yuexiu District, Guangzhou, P.R. China
Tel 020-83653489
Mapei Building Materials Technology (Zhejiang) Co., Ltd
No.1633, Shilin Road, Wuxing, Huzhou, Zhejiang, China
Tel: 0572-215 9888
E-mail: [email protected]