| 场地 | Campus, ice rink |
|---|---|
| 位置 | Langnau im Emmental, 瑞士 |
| 子目录 | 体育中心 |
| 施工 |
Pegrila AG from Bern carried out the demanding concrete and flooring work for the new ice rink on the first floor of the campus.
This resulted in a highly precise 14 cm-thick concrete slab with complex reinforcement and exact surface accuracy, for which a special concrete mix was developed in collaboration with partners. |
| 开始和结束日期 | 2023/2024 |
| 施工类型 | 外加剂 |
| 安装公司 | Frutiger AG Hochbau | Pegrila AG, Bern |
| 项目经理 | SCL-Tigers AG, Langnau i. E. |
| 马贝协调员 | Thomas Liniger |
| 链接到详细信息页面 | https://www.mapei.com/ch/de-ch/realta-mapei/artikeldetail/der-neue-hockey-campus-in-langnau |