| 场地 | Tunnel |
|---|---|
| 位置 | Giswil, 瑞士 |
| 子目录 | 隧道 |
| 施工 |
The A8 is the main artery for road traffic from the Brünig area toward the Lucerne region. Its core element is the 2.1-kilometre long Kaiserstuhl Tunnel, which includes escape and safety tunnel.
Approximately 80,000 m3 of concrete is produced in Alpnach and Horw by the Jura Group. |
| 开始和结束日期 | 2024/2029 |
| 施工类型 | 地下建筑物 |
| 承包商公司 | Frutiger AG, Thun |
| 安装公司 | Frutiger AG, Thun |
| 项目经理 | Canton of Obwalden |
| 马贝协调员 | Roger Wyrsch |