| 场地 | University hospital, MITTE1|2, excavation pit |
|---|---|
| 位置 | Zurich, 瑞士 |
| 子目录 | 医院, 大学 |
| 施工 | For the excavation of around 200,000 m³, the product Mapequick AFK 777 T was used to reliably secure the slopes. This solution ensured stability during the construction phase and contributed to the safety and efficiency of the project. |
| 开始和结束日期 | 2024/2025 |
| 施工类型 | Cement additives |
| 安装公司 | Greuter AG, Hochfelden |
| 项目经理 | University of Zurich |
| 马贝协调员 | Urs Wirth |