| 场地 | CAF subfloor |
|---|---|
| 位置 | Meinisberg, 瑞士 |
| 子目录 | 学校 |
| 施工 |
In the extension building of the Meinisberg school, a new CAF subfloor was installed to create a stable and even foundation for the subsequent floor coverings.
The execution ensures high load-bearing capacity and a durable base that meets the demands of school operations. |
| 开始和结束日期 | 2024 |
| 施工类型 | 地坪 |
| 安装公司 | Brodbeck AG, Biel |
| 建筑师 | Skop AG, Zurich |
| 项目经理 | Municipality of Meinisberg |
| 马贝协调员 | David Dellenbach |