| 场地 | The existing gallery was extended by 320 metres with the new building. |
|---|---|
| 位置 | Disentis, 瑞士 |
| 子目录 | 隧道 |
| 施工 | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
| 开始和结束日期 | 2021 |
| 施工类型 | 筑路 |
| 安装公司 | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
| 项目经理 | Kanton Graubünden |
| 马贝协调员 | Marco Jungi |