| 场地 | Circle Line Stage 5 |
|---|---|
| 位置 | 新加坡 |
| 子目录 | 隧道 |
| 建于 | 2006 |
| 打开 | 2009 |
| 施工 | Reinstatement works such as bored tunnelling, excavation and completing basic station structure. |
| 施工类型 | 地下建筑物 |
| 承包商公司 | Woh Hup (Singapore), Shanghai Tunnelling (China), Alpine Mayreder (Austria). WSA JV |
| 安装公司 | Woh Hup (Singapore), Shanghai Tunnelling (China), Alpine Mayreder (Austria). WSA JV |
| 马贝经销商 | Mapei Far East Pte Ltd |