| 场地 | Ceramic tiles were laid on the walls and floor in the bathrooms of the trendy new building. |
|---|---|
| 位置 | 瑞士 |
| 子目录 | 多功能中心 |
| 施工 |
The eleven-storey building offers a mix of flats and office space. Shopping facilities are available on the ground floor. The first four floors are loft-like office spaces and offer an ideal working environment.
The top floors contain 1.5- to 4.5-room flats. |
| 开始和结束日期 | 2021/2022 |
| 施工类型 | 地面/墙面面层材料 |
| 承包商公司 | Implenia Basel |
| 安装公司 | Implenia Basel |
| 建筑师 | Bachelard-Wagner Architekten, Basel |
| 项目经理 | Warteck Invest AG, Grenzacherstrasse 79, 4058 Basel |
| 马贝协调员 | Patrick Gerber |