场地 | Huawei housing project |
---|---|
位置 | Dongguan, 中国 |
子目录 | 公寓 |
建于 | 2011 |
打开 | 2013 |
施工 | Mapei products have had an important role in the construction of this big housing project.Used Keraquick to bond 600x600 artificial marble flooring, Adesilex P9 and Kerabond to bond tiles. |
施工类型 | 新建筑 |
承包商公司 | CSCEC 5th Branch Company |
安装公司 | SDCIC |
建筑师 | CADRG,CEEDI, NIKKEN SEKKEI |