| 场地 | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
|---|---|
| 位置 | Hérémence, 瑞士 |
| 子目录 | 酒店/旅馆 |
| 施工 | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
| 开始和结束日期 | 2022 |
| 施工类型 | 地面/墙面面层材料 |
| 建筑师 | Mijong Architecture Design |
| 项目经理 | Grande Dixence SA |
| 马贝协调员 | Marcello Maieron |