| 场地 | Metro line tunnel |
|---|---|
| 位置 | 新加坡 |
| 子目录 | 隧道 |
| 建于 | 2014 |
| 打开 | 2021 |
| 施工 |
Tunnelling and Waterproofing solutions for Marina Bay Station T226 for Thomson Line
Mapeplan waterproofing system were supplied for drill and blast tunnel using ground-freezing method, a first in Singapore rail construction. |
| 开始和结束日期 | 2016/2019 |
| 施工类型 | 地下建筑物, 防水 |
| 承包商公司 | Taisei Corporation |
| 安装公司 | Lee Construction |
| 马贝经销商 | Mapei Far East Pte Ltd |
| 积分 | Mapei Far East Pte Ltd |
| 马贝协调员 | William Neo, Jiang Shan |