| 场地 | The Sahligut learning swimming hall was completely renovated. The overall renovation included a new chrome steel swimming pool and a new glass façade, the complete replacement of the pool water technology and the redesign of the cloakroom area. |
|---|---|
| 位置 | Biel, 瑞士 |
| 子目录 | 水上运动中心 |
| 施工 | The teaching pool at the Sahligut school was built between 1967 and 1968. After 50 years of operation, a comprehensive renovation was urgently needed. |
| 开始和结束日期 | 2021/2022 |
| 施工类型 | 地面/墙面面层材料 |
| 建筑师 | Leimer Tschanz Architekten AG, Viaduktstr. 33, 2501 Biel Natalie Wyss Architektin |
| 项目经理 | Stadt Biel/Bienne Tobias Grimm Architekt und Projektleiter |
| 马贝协调员 | Pirmin Nünlist |