| 场地 | corridors and interior rooms |
|---|---|
| 位置 | Melbourne, 澳大利亚 |
| 子目录 | 医院 |
| 建于 | 2014 |
| 打开 | 2016 |
| 施工 | supplying products for preparing, waterproofing and leveling substrates, for the installation of vinyl walls and floors and self-laying textile tiles |
| 施工类型 | 地面/墙面面层材料 |
| 业主 | Victorian State Government |
| 承包商公司 | Floor91 |
| 安装公司 | Grocon |
| 项目经理 | Silver Thomas Hanley, DesignInc and McBride, Charles Ryan |
| Project Manager | Plenary Health |
| 马贝协调员 | Scott Coutts (Mapei Australia Pty Ltd) |
在这里,您可以下载与该项目相关的所有文档