 Parcourir par GAMMES DE PRODUITS
                                                            
                                                            Parcourir par GAMMES DE PRODUITS
                                                            
                                                        
                                                     Toutes les gammes de produits
                                                                    
                                                                    Toutes les gammes de produits
                                                                
                                                             Recherche de produits
                                                                    
                                                                    Recherche de produits
                                                                
                                                             Sous les projecteurs
                                                                    
                                                                    Sous les projecteurs
                                                                
                                                                 Hobart, Australie
                                
                                    Hobart, Australie
                                
                             
                            | Chantier | Preparation and Installation of Floor and Wall Coverings | 
|---|---|
| Localisation | Hobart, Australie | 
| Sous-catégorie | HOPITAL | 
| Construit en | 2017 | 
| Ouvert en | 2019 | 
| Demande | Supply of surface preparation, waterproofing and adhesives to install both wall and floor coverings The Royal Hobart Hospital is Tasmania's largest hospital and the major teaching hospital of the University of Tasmania. The redevelopment of the Hospital comprises a new multi-level building that will accommodate inpatient facilities, operating theatres and interventional suites above an existing ward building on Campbell Street. It will include a women's and children's precinct, a maternity ward, delivery and birthing suites, a dedicated adolescent unit and a paediatric ward. The scope of the project included construction of 39,000 m2 of new space and refurbishment of 11,000 m2 of existing clinical areas (including early works) and site-wide infrastructure upgrades. | 
| Date de début et de fin | 2017/2019 | 
| Type de demande | Sols/murs, Preparation des supports, Impermeabilisation | 
| Titulaire | Tasmanian Department of Health | 
| Entreprise de sous-traitance | John Holland | 
| Installateurs | Floor91 | 
| Architectes | Lyons Architects | 
| Responsable de projet | Shane Ward | 
| Coordination MAPEI | Jamie Billing | 
 
                                                     
                                                     
                                                     
                                                     
                                                     
                                                     
                                                    