Parcourir par GAMMES DE PRODUITS
Toutes les gammes de produits
Recherche de produits
Sous les projecteurs
| Chantier | Section Between Scenic Hill and Hong Kong Boundary Crossing Facilities |
|---|---|
| Localisation | Hong Kong |
| Sous-catégorie | TUNNEL |
| Demande | Waterproofing (Mapeplan TUS - 80,000 m2 & Purtop - 83,000 m2) |
| Date de début et de fin | 2015/2017 |
| Type de demande | Travaux souterrains |
| Titulaire | Hong Kong SAR Government - Highway Dept. |
| Entreprise de sous-traitance | China State Construction Engineering (Hong Kong) Limited |
| Installateurs | Hopshing Waterproof Construction Co. Ltd. |
| Distributeur MAPEI | Mapei China Ltd. |
| Other | Scenic Hill Tunnel is a part of Tuen Mun Check Lap Kok Link construction, which included a 1 km dual-3 lane drill and blast tunnel and 1.6 km cut and cover tunnel. Contractor looked for a reliable waterproofing system to prevent from any risk of water leakage which is the reason why Purptop 400M HK was chosen. |