Chantier | car park flooring |
---|---|
Localisation | Dubai, Émirats Arabes Unis |
Sous-catégorie | PARKING |
Construit en | 2024 |
Ouvert en | 2024 |
Demande | The scope involved refurbishment of the basement car park flooring where the existing epoxy coating was peeling off and surface cracks were visible. |
Date de début et de fin | 2024 |
Type de demande | Sols |
Titulaire | ARCO Turnkey Solutions Llc |
Installateurs | Gecko Middleeast Technical Services Llc |
Architectes | Young Engineering Llc |
Coordination MAPEI | Ashok |