Parcourir par GAMMES DE PRODUITS
Toutes les gammes de produits
Recherche de produits
Sous les projecteurs
| Chantier | pools and wet rooms |
|---|---|
| Localisation | Flitwick, Bedfordshire, Royaume-Uni |
| Sous-catégorie | CENTRE SPORTIF |
| Demande | installation of ceramics and wet rooms |
| Date de début et de fin | 2016 |
| Type de demande | Sols/murs |
| Titulaire | Stevenage Leisure Ltd. |
| Entreprise de sous-traitance | Tiletec Group |
| Installateurs | Tiletec Group |
| Other | The £14.7m new build leisure centre comprises a 25m2 competition pool, 13m2 learner pool (with raised floor) and confidence water pool. In addition to the pools, there are four discrete changing/shower areas which have been fully tiled; wet change, dry change, outside change and fitness suite changing, along with floor tiling to circulation areas and staircases amounting to a further 750m2 of tiling. |