Chantier | Apartments, swimming pools |
---|---|
Localisation | Dubai, Émirats Arabes Unis |
Sous-catégorie | HOTEL |
Construit en | 2019 |
Ouvert en | 2023 |
Demande | Mapei's products and expertise have been utilized in various aspects, such as interior and exterior floor installations, outdoor decks, waterproofing, and concrete strengthening. |
Date de début et de fin | 2019/2023 |
Type de demande | Reparation des betons, Tile & stone installation systems, Impermeabilisation |
Titulaire | Marsa Al Arab |
Entreprise de sous-traitance | ASGC |
Responsable de projet | ATK Engineering Consultants, Killa Design, Aecom, Wilson Asso, HBA |