KERACRETE

Synthetic latex rubber mixed with KERACRETE POWDER (white or grey) or with sand and cement (thickness up to 5 mm).
TECHNICAL DATA OF KERACRETE + KERACRETE POWDER:
Pot life of mix: 90 minutes.
Open time: 20 minutes.
Waiting time before grouting:
- on walls: 4-6 hours;
- on floors: 24 hours.
Set to light foot traffic: approx. 3 days.
Ready for use: approx. 14 days (21 days for basins and swimming pools).
Colours available: – KERACRETE POWDER: grey and white.
Application: N° 5 or 6 or 10 notched trowel.
EMICODE: EC1 R Plus - very low emission.
Mixing ratio: 4 kg with 1 kg of KERACRETE.
Storage:
– KERACRETE: 24 months. Protect from frost.
– KERACRETE POWDER: 12 months.
Consumption:
– 0.5-1 kg/m ² of KERACRETE;
– 2-4 kg/m ² of KERACRETE POWDER.
Packaging:
KERACRETE: 5 and 25 kg drums;
KERACRETE POWDER: 25 kg bags.

VOLATILE ORGANIC COMPOUND (VOC) LEVEL
Type of Regulated Adhesives under the Air Pollution Control
(Volatile Organic Compounds) Regulation of Hong Kong:
[Ceramic tile adhesives]
VOC content (ready to use) 32 g/litre.

Related documentation

Technical data sheet
Download

Last Projects KERACRETE

Category icon TRANSPORTATION

2019

HKAA Contract C17W002 Car Park 1 Enhancement Works

Lantau Island, Hong Kong

Installation of floor and wall coverings

Category icon SPORT FACILITIES

2014

Sports and fitness complex Salavat-Kupere

Kazan, Russia

Concrete restoration, Floor/wall covering, Sealants application, Surface preparation, Waterproofing

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2012/2013

Aquapark "Galaktika"

Sochi, Russia

Concrete restoration, Installation of floor and wall coverings, Sealants application, Surface preparation, Waterproofing

Category icon SPORT FACILITIES

2014

Swimming pool of Beloyarskoy NPP

Zarechny, Russia

Installation of floor and wall coverings, Sealants application, Surface preparation, Waterproofing

Keep in touch

Subscribe to our newsletter to get Mapei news