Langlands Memorial Park Aquatic Centre

Location icon Brisbane, Australia
Worldwide, Mapei has developed a long history of being involved with the construction of Olympic swimming pools. It was back in 1996 that Mapei Australia was instrumental in assisting with the Sydney Olympics 50 metre swimming pool at Olympic Park, Homebush. With this type of practical expertise, Mapei was again involved in installing the waterproofing and adhesive systems required for this type of project.

Construction

Product used for the project

KERAPOXY
KERAPOXY
Two-component, high-performance, anti-acid epoxy mortar and adhesive with no…
MAPELASTIC SMART
MAPELASTIC SMART
Two-component, high-flexibility cementitious mortar (with crack-bridging > 2…
PLANITOP SMOOTH & REPAIR R4 ZERO
PLANITOP SMOOTH & REPAIR R4 ZERO
Structural R4-class, rapid-setting, shrinkagecompensated, thixotropic,…
This product replaces PLANITOP SMOOTH & REPAIR R4
TOPCEM
TOPCEM
Special normal-setting, quick-drying (4 days), controlled-shrinkage hydraulic…
TOPCEM PRONTO
TOPCEM PRONTO
Ready-to-use, normal-setting, controlled-shrinkage mortar with high thermal…
ISOLASTIC 50
ISOLASTIC 50
Product not available for this market,
contact us
KERABOND PLUS
KERABOND PLUS
Product not available for this market,
contact us
MAPETARD ES
MAPETARD ES
Product not available for this market,
contact us
PLANICRETE SP
PLANICRETE SP
Product not available for this market,
contact us
PLANISEAL 88
PLANISEAL 88
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news