 Warsaw, Poland
                                
                                    Warsaw, Poland
                                
                             
                            | Yard | Oak floor in ministerial offices of Presidential Palace. | 
|---|---|
| Location | Warsaw, Poland | 
| Subcategory | PALACE | 
| Opened in | 1643 | 
| Application | Renovation of oak floor in ministerial offices of Presidential Palace | 
| Application Type | Installation of floors | 
| Client | State owned | 
| Contractor company | STUDIO PODLOG DREWNIANYCH Piotr Warzecha | 
| Installer companies | STUDIO PODLOG DREWNIANYCH Piotr Warzecha | 
| MAPEI Distributor | STUDIO PODLOG DREWNIANYCH Piotr Warzecha | 
| Credits | Boguslaw Warzecha | 
| MAPEI Coordination | Marcin Wargocki | 
 
                                 
                                