Područje zahvata | The existing gallery was extended by 320 metres with the new building. |
---|---|
Lokacija | Disentis, Switzerland |
Podkategorija | TUNNEL |
Opis izvođenih radova | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
Datum početka i završetka | 2021 |
Vrsta radova | Održavanje cesta i urbanističko projektiranje |
Izvođač radova | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
Voditelj projekta | Kanton Graubünden |
MAPEI koordinator | Marco Jungi |