Područje zahvata | The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530. |
---|---|
Lokacija | Hérémence, Switzerland |
Podkategorija | HOTEL/INN |
Opis izvođenih radova | The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus. |
Datum početka i završetka | 2022 |
Vrsta radova | Podno / zidno pokrivanje |
Projektant | Mijong Architecture Design |
Voditelj projekta | Grande Dixence SA |
MAPEI koordinator | Marcello Maieron |