MAPEFLEX PU21

Two-component, high-strength, castable epoxy-polyurethane sealant for movements up to 5%.
TECHNICAL DATA:
Movement in service: 5%.
Shore A hardness: 65.
Workability time: 45 minutes.
Set to light foot traffic: 24-36 hours.
Colour: 113 grey.
Application: by pouring.
Consumption: 0.15 kg/linear metres (10x10 mm section).
Packaging: 5 and 10 kg drums (A+B).

Related documentation

Technical data sheet
Download
Safety Data Sheet
Download

Last Projects MAPEFLEX PU21

Category icon COMMERCIAL FACILITIES

2018

Central i-City Mall

Shah Alam, Malaysia

Floor/wall covering, Installation of floor and wall coverings

Category icon PRODUCTION FACILITIES

2010

Cheese factory Sarmich

Sarmich, Mordoviya, Russia

Concrete restoration, Installation of floors, Surface preparation, Waterproofing

Category icon PRODUCTION FACILITIES

2017/2018

Former plant Sacramora

VIserba di RImini, Italy

Sealants application

Category icon COMMERCIAL FACILITIES

2015/2017

Plaza Arkadia

Malaysia

Installation of floor and wall coverings

Keep in touch

Subscribe to our newsletter to get Mapei news