ULTRACOLOR PLUS

High-performance, anti-efflorescence, quick-setting and drying polymer-modified mortar with water-repellent DropEffect® and mould-resistant BioBlock® technology for grouting joints 2 to 20 mm wide.
TECHNICAL DATA:
Pot life of mix: 20-25 minutes.
Waiting time before finishing: 15-30 minutes.
Set to light foot traffic: approx. 3 hours.
Ready for use: 24 hours (48 hours for basins and swimming pools).
Colours: 34.
Application: rubber trowel.
Finishing: MAPEI sponge or Scotch-Brite® pad.
EMICODE: EC1 Plus - very low emission.
Storage:
– 12 months (23 kg bags);
– 24 months (1 and 5 kg bags).
Consumption: according to the size of the joints.
Packaging: 23 kg bags and 4x5 kg Alupack and 9x2 kg Alupack boxes, according to the colour.

Certifications

Related documentation

Technical data sheet
Download
Safety Data Sheet
Download
EPD
Download
GEV
Download

Color Palette

115 River Grey
152 Liquorice
139 Powder Pink
174 Tornado

Last Projects ULTRACOLOR PLUS

Category icon TOURISM AND WELLNESS

2014/2018

W Hotel Palm Jumeirah

Dubai, United Arab Emirates

Floor/wall covering

Category icon TOURISM AND WELLNESS

Al Bandr Rotana Hotel

Dubai, United Arab Emirates

Installation of floor and wall coverings

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

Wahat Al Karama (Oasis of Dignity)

United Arab Emirates

Installation of floor and wall coverings

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

Khalifa University Expansion

Abu Dhabi, United Arab Emirates

Installation of floor and wall coverings

Keep in touch

Subscribe to our newsletter to get Mapei news