Yard | the implementation of a set of measures for the repair and leveling of concrete surfaces, the strengthening of the tunnel arch, the production of concrete tubings |
---|---|
Location | Krasnodar, Russia |
Subcategory | MOTORWAY |
Built in | 2009 |
Opened in | 2013 |
Application | concrete repair, leveling of concrete surfaces, production of concrete tubings, strengthening of the tunnel arch |
Start and finish date | 2010/2011 |
Application Type | Surface preparation, Masonry restoration, New building |
Client | "Chernomorie" |
Contractor company | "Tunnelniy otryad 44" |
Architects | Sibgiprotransput - Roszheldorproekt branch |