MAPECOAT I 600W

Two-component transparent epoxy primer in water dispersion.
TECHNICAL DATA:
Consistency of mix: fluid.
Colour of mix: opaline.
Mixing ratio: comp. A: comp. B = 2.3 : 3.6.
Workability time: 2-3 hours.
Dust dry at +23°C and 50% R.H.: 3-4 hours (first coat); 6-8 hours (second coat).
Final hardening time: 7 days.
Application temperature range: from +8°C to +35°C.
Storage: 24 months in its original sealed packaging.
Application: roller, spray or airless spray.
Consumption: 300-500 g/m², depending on the absorbency rate of diluted product.
Packaging: 5.9 kg kits and 11.8 kg kits (A + B).

Documentación relacionada

Hoja de datos
Descargar

Últimos proyectos MAPECOAT I 600W

Category icon INSTALACIONES DEPORTIVAS

2016/2017

One Life Gym

Beit Chabeb, Líbano

Soluciones para pavimentos deportivos

Category icon ESPACIOS / EDIFICIOS PÚBLICOS

2018

Antonine Sisters School

Ghazir, Líbano

Soluciones para pavimentos deportivos

Category icon INSTALACIONES PARA TRANSPORTE

2016/2018

New Istanbul Airport

Istanbul, Turquía

Floor/wall covering, Impermeabilización, Anclaje

Manténgase en contacto

Suscríbase a nuestro boletín para recibir las noticias de Mapei