TRIBLOCK P

Three-component epoxy-cementitious primer for non-absorbent waterproofing damp substrates.
TECHNICAL DATA:
Consistency: comp. A liquid; comp. B liquid; comp. C powder.
Colours: comp. A white; comp. B white; comp. C white.
Mixing ratio: comp. A : comp. B : comp. C = 12 : 38 : 50.
Workability time: 30-40 minutes.
Waiting time between first and second coat: 4-6 hours.
Waiting time before laying floors or applying smoothing compound: 18 hours.
Maximum waiting time before laying floors or applying smoothing compound: 7 days.
Storage: 24 months.
Application: brush or roller.
Consumption: 0.5 kg/m².
Packaging: 5 kg drums (A+B+C).

Documentación relacionada

Hoja de datos
Descargar

Últimos proyectos TRIBLOCK P

Category icon INSTALACIONES DEPORTIVAS

2018

Fijlkam Olympic Centre

Ostia, Italia

Soluciones para pavimentos deportivos

Category icon ESPACIOS / EDIFICIOS PÚBLICOS

2017/2018

Studio Legale Neri

Ostia Lido, Italia

Impermeabilización

Category icon INSTALACIONES PARA TRANSPORTE

2019

Digestore anaerobico depuratore ACEA Roma Sud

Roma, Italia

Impermeabilización

Category icon INSTALACIONES DEPORTIVAS

2019

Gualdo Cattaneo multisport court

Gualdo Cattaneo, Italia

Soluciones para pavimentos deportivos

Manténgase en contacto

Suscríbase a nuestro boletín para recibir las noticias de Mapei