Obra | Epic Systems Corporate Campus |
---|---|
Localização | Madis, USA |
Subcategoria | ESCOLA |
Aplicação | Epic Systems Corporate Campus |
Tipo de aplicação | Construção nova, Adjuvantes |
Empreteiro | J.H. Findorff & Son, Inc. |
Arquitetos | Cuningham Group & Zimmer Gunsul Frasca Architect |
Descrição |
Project Engineer: Magnusson Klemincic Ready Mix Supplier: Wingra Redi-Mix Project Facts: Unique award winning project located on 350 acres of rolling hills near Madison, WI. Project includes a three-story office building structured over a below grade, three-level post-tensioned underground parking ramp. Due to occupancy requirements by the owner, four office buildings and one parking ramp were constructed on a parallel schedule instead of a consecutive schedule. This fast track schedule entailed using high performance concrete to ensure the schedule was met. This project utilized 35,000 cy of poured in-place concrete. 20 different mix designs were used throughout this project. |