Obra | concrete admixtures |
---|---|
Localização | Void-Vacon, France |
Subcategoria | PONTE |
Aplicação |
Supply of concrete admixtures
The Void canal bridge, overlooking the Marne-Rhine canal in the Meuse in France, has been renovated. This major renovation project was to strengthen its foundations and its deck. Mandated by the company Berthold, our client Chardot TP delivered all the concrete, formulated using MAPEI admixtures: foundation concrete c20 / 25 xc2, c35 / 45 xc4 xf1, concrete C35 / 45 xf4, concrete C45 / 55 or even self-compacting. The deck bridget were poured using two pumps simultaneously, one of 46m and the other of 47m! |
Data de início e fim | 2021 |
Tipo de aplicação | Adjuvantes |
Proprietário | Chardot TP |
Empreteiro | Berthold |
Project Manager | Vivien Wack |
Descrição | Fabrication et livraison du béton : Chardot TP |