Yard | Interior concrete surface preparation, leveling, installation of ceramic tile, wood flooring with sound-reduction and exterior large-format tiles |
---|---|
Locație | Burlington, Canada |
Sub-categorie | HOTEL |
Integrat | 2021 |
Aplicație | A variety of setting materials and innovative sound-reduction products from MAPEI were all part of completing a new-build complex of luxury residences and a four-star Marriott hotel on Lake Ontario’s north shore. |
Data de început și de finalizare | 2016/2021 |
Tipul aplicației | Constructie noua, Tile & stone installation systems |
Deținător | The Rosseau Group Inc. and Pearle Hospitality (The Pearle) |
Societate contractantă | New Horizon Development Group |
Societăți de instalare | Classic Tile Contractors Limited (Bridgewater) and Eden Tile-It (The Pearle) |
Distribuitor MAPEI | Dragona Flooring et Prosol Inc. |
Credite | Carole & Roy Timm Photography and Greg van Riel Photography |
Coordonare MAPEI | Gino D'Alesio |
Descriere | Architects: Gluckstein Design Planning (Bridgewater) and Studio Munge (The Pearle) |
De aici puteți descărca toate documentele care fac referire la acest proiect