Avalanche gallery Scopi 3

Location icon Disentis, Switzerland
Ссылка #: 4636
Категория: ДОСТОПРИМЕЧАТЕЛЬНОСТИ

Строительство

Yard The existing gallery was extended by 320 metres with the new building.
Местоположение Disentis, Switzerland
Подкатегория TUNNEL
Применение By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used.
Дата начала и окончания 2021
Тип применения Roading
Установщик Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona
Проектный менеджер Kanton Graubünden
Координатор MAPEI Marco Jungi

Продукты, использованные в этом объекте

DYNAMON SR 912 CH
DYNAMON SR 912 CH
Product not available for this market,
contact us
MAPEAIR AE 20
MAPEAIR AE 20
Product not available for this market,
contact us
MAPETARD D
MAPETARD D
Product not available for this market,
contact us
775 - ANTIGELO S
ANTIGELO S
Product not available for this market,
contact us

Оставайтесь на связи

Подпишитесь на нашу рассылку, чтобы получать новости MAPEI