Yard | Holy Trinity Greek Orthodox Church |
---|---|
Местоположение | Carmel, USA |
Подкатегория | CHURCH |
Построен в | 2008 |
Открыт в | 2016 |
Применение | Holy Trinity Greek Orthodox Church |
Дата начала и окончания | 2016 |
Тип применения | Installation of floors |
Владелец | Holy Trinity Greek Orthodox Church |
Подрядчик | Certified Floorcovering Services, Inc. |
Установщик | Certified Floorcovering Services, Inc. |
Архитекторы | CJK Design Group |
Дистрибьютор MAPEI | Carpet Cushions & Supplies |
Credits | Brian Estes |
Project Manager | Brian Estes |
Координатор MAPEI | Tyler Barton |
Описание | MAPEI’s surface-preparation products were used to prepare the Holy Trinity Greek Orthodox Church’s floor to receive new tile flooring. ECO Prim Grip™ primer was used to cover the polished concrete surface, eliminating the need for shotblasting that could harm the church’s delicate treasures. MAPEI mortars and grouts gave the perfect touch to the new installation. |