Yard | The bridge was repaired. |
---|---|
Местоположение | Schoried, Switzerland |
Подкатегория | BRIDGE |
Применение | The bridge, built in 1934, was repaired in 2020. |
Дата начала и окончания | 2020 |
Тип применения | Structural reinforcement |
Установщик | Bürgi Bau AG |
Координатор MAPEI | Stephan Moosmann |